久久亚洲国产成人影院-久久亚洲国产的中文-久久亚洲国产高清-久久亚洲国产精品-亚洲图片偷拍自拍-亚洲图色视频

US EUROPE AFRICA ASIA 中文
China / Cover Story

How the new high-speed railway came on track

By Hu Yongqi and Xiang Mingchao in Zhengzhou and Yang Wanli in Beijing (China Daily) Updated: 2012-12-27 09:50

All HSR trains are taken to the workshop after they have covered 4,000 km or have been in service for 48 continuous hours. When the kilometers add up to 30,000 km, the trains are taken out of service for an intensive revamp.

"When a train arrives at our workshop, the maintenance engineers check it from top to bottom, including the wheels, the upper and lower electrical circuits and the high-voltage equipment. Each train is worked on by a team of 14, which has to complete all the checks and repairs in two hours and 35 minutes," said Ma Tao, deputy director of the workshop.

The maintenance engineers test 16 wheels in 30 minutes. If they encounter any damage, the engineers are only allowed to begin repairs after receiving permission from the quality-control inspectors. On the night of Dec 20, the engineers discovered that a link connecting the wheels was close to breaking point. A quality-control inspector took two minutes to assess the damage and then gave permission for the part to be replaced. He recorded the entire process on his camera and gave the old component a number for recycling.

"Usually, small parts are more easily broken. Wheels, which are 86 cm in diameter and can last for at least six months, are replaced when the diameter reduces to 79 cm, which takes about the same time," said Luo.

Engineer Cai Quan said he walks at least 15 km every night to fix trains on a predetermined line. "My wife complains that my shoes wear out much faster than my neighbors'," he said. "But that's my job."

More than 100 cameras have been installed in the workshop to monitor all the checkups and repair procedures. Engineers swipe their cards at the entrance which bears the slogan, "Zero tolerance to technical problems", and then all their moves in the workshop can be recorded. A giant screen in the monitoring center shows which engineer is working on which train. When the engineers finish their tasks, a video is prepared to aid investigations in the event of any subsequent accidents.

Drivers are the key

The railway system has upgraded equipment and new technologies. At Zhengzhou East Railway Station, a new system has been built to verify high-speed train tickets through personal ID cards. Even if the passenger has lost their ticket, the system will still allow them to ride the train.

On the fifth floor of a building next to Zhengzhou Railway Station, new drivers practice in a lifesize simulation of a driver's cabin as the rails unfold on an enormous white screen in front of them. Once initiated, the system can offer the drivers eight courses of action to follow and provides changing routes on the screen. A speed limit is set and the drivers learn to take the appropriate course of action when the light on the panel changes color.

Guo Xiansheng, a 33-year-old who now drives the route between Zhengzhou and Wuhan, capital of Hubei province, said the system has helped him follow standard operating procedures.

How the new high-speed railway came on track

An attendant hands a brochure to a passenger on the Beijing-Guangzhou high speed train which went into operation on Wednesday. Wang Zhongju / China News Service

Highlights
Hot Topics

...
主站蜘蛛池模板: 国产亚洲综合久久 | 国产三级在线观看视频 | 亚洲午夜久久久久影院 | 日本肥老妇色xxxxx日本老妇 | 手机在线看a | 韩国一级毛片视频 | 免费视频99| 久久精品视频免费在线观看 | 狠狠色丁香九九婷婷综合五月 | 亚洲天堂一区二区 | 国产精品路边足疗店按摩 | 免费a级黄毛片 | 国产三级国产精品国产普男人 | 99久在线| 欧美成人性性 | 亚洲精品日韩在线一区 | 国产成人综合洲欧美在线 | 欧美特黄视频在线观看 | 91精品观看91久久久久久 | 国产精品亚洲一区在线播放 | 色噜噜国产精品视频一区二区 | 国内国语一级毛片在线视频 | 在线一级片 | 中文字幕在线观看日韩 | 天码毛片一区二区三区入口 | 日韩国产三级 | 国产日本韩国 | 欧美jizzhd精品欧美高清 | 欧美第一页草草影院浮力 | 日本特黄特色大片免费视频网站 | 最新版天堂资源中文官网 | 美女扒开双腿让男人桶 | 色综合久久久 | 国产精品成人观看视频免费 | 欧美亚洲综合另类在线观看 | 91av久久| 久久视频6免费观看视频精品 | 免费 欧美 自拍 在线观看 | 成人黄色一级毛片 | 国内久久精品 | 怡红院亚洲 |